Utility Scale Turnkey Solar Power Solution Company in Coimbatore

For large size consumers and consumers not having roof space are offered with utility scale power plant on a turnkey where in we handle the entire process of developing and handing over the completed power plant to end clients , avoid them from any hastles they have to go through in the process of setting up the plant which is also not their core business and provides time for their focus on core.

Through our utility EPC service provided by a third party, today, our customers are proud owners of some of India's finest plants, which generate more energy than plants of comparable capacity. Our strength is our in-house design and production team, as well as our efficient construction teams and extensive industry and technical knowledge.

Our customers also benefit from our advisory services, which assist them to comprehend and get clarity on issues of solar power plant financing, policies, land, financial benefits, and regulatory approvals.

Libaka goes above and beyond the contract and value design to ensure that customers get the most out of their investment.

Our Services

why choose Utility Scale Solar from us
As a leading solar Panel Installer, we guarantee that all of our customers will save money on their electricity bills. If you are looking for cost-effective solar solutions for commercial usage, kindly call us.
  • Advantages
  • Our Projects
  • The Benefits of Investing in Utility-Scale Solar
  • Electricity prices are stabilized and maintained throughout time at a low level.
  • It's possible to combine it with a battery.
  • On a utility-scale project, bifacial solar can be used.
  • Effective in terms of money.
  • Solar systems on a utility scale are more environmentally friendly.
  • MWp AC power plant for a Client @ Rasathi Valasu near Palladam, TN(In operation for 6 months)
  • 2.5 MWp AC power plant for a client @ Irumborai, TN (Under execution)

Philosophy of form following function prevalent in modernism. These designs represent the ideals of cutting excess, practicality and an absence of decoration. These forms of lamps are visually light and follow minimalist principles of design which are influenced by architectural concepts like the cantilever.

Provisioning

Supporting

Regulating

Our Services Include

Libaka Renewable Power, one of India's leading solar Panel manufacturers, offers operations and maintenance services that include accurate inspection.

Service

Service

In order to achieve excellent performance while reducing the risk of downtime, proper service is important.

Read More

Operations

Operations

Installing, supervising, monitoring, controlling, and optimizing the performance of your plant are all things we do.

Read More

Maintenance

Maintenance

Solar cells and PV panels must be cleaned on a regular basis. All thermal-based components should be maintained on a regular basis.

Read More

FAQ’s

Questions About Utility Scale Solar Plants

What kind of warranties does Libaka offer?

How much land is required per MW to build a solar project?

In general, a solar PV plant can be built on a usable land area of 4.5–5 acres per MW. The space required may vary from project to project depending on the location and latitude of the project site, technical needs, DC overloading, pitch, and tilt of the MMS.

Is it true that Libaka Renewables constructs solar power facilities according to its own specifications?

Yes, we have our own technical specifications and standards in place to provide the highest plant performance and durability for a solar project. However, if certain specific features are required by an independent power producer, they can be added on, and we can construct the plant according to the IPP's or lenders' RFP.

How long does it take to build a solar power project?

A project of this size (100 MW) normally takes 6-8 months to complete. It varies depending on the project's capacity, location, the scope of work (i.e., whether the substation is part of the EPC), and commissioning month (i.e., rainy season). Inconsistency in Open Access eligibility and operational conditions Exclusion from the Open Access ProgramFrom the standpoint of utilities, Approval procedure based on paper